MENU

Killarney Aquatic and Recreation Centre

Killarney Aquatic and Recreation Centre – Extensive Renovation

This City of Calgary Recreational facility was scheduled for Extensive interior upgrades and refurbishing. Calibre completed the construction of a newly designed reception area, administrative offices, change rooms, washrooms, pools, sauna and public areas.

The renovation involved the installation of entirely new acoustical tile ceilings throughout most of the huge complex, with plumbing, electrical, millwork, and replacement of several thousand square feet of tiling and the re-grouting of four pools.

The ladies, Men’s and Special needs change rooms were completely gutted to accommodate new modern stainless steel lockers, new wall and floor tiling, new showers, Corian sinks and faucets, mirrors and a complete upgrade of all toilets and accessories.

A complete revamp of the public viewing gallery with special epoxy paints applied for a new and clean updated look.

One new feature added was the painting of the signature “Wave Wall” which added a very modern touch to this extremely popular Aquatics venue.

Calibre’s weekly on-site construction updates with clients, trades, engineers, architects and city officials along with our comprehensive communication program ensured the schedule was maintained any unforeseen issues that arose were identified and dealt with immediately.

As prime Contractor Calibre secured all required permits and the scope of work was completed ahead of schedule including additional work that was added in progress. Calibre’s attention to detail and ongoing deficiency review program meant an almost non-existent deficiency list at the end of the project.

Gallery
Let’s chat about how we can help.

We’re here for you. We would be happy to discuss your project parameters and outline the steps to its success.

A proud member of the Calibre Group of companies